Versatec
Home » 400E Remanufacturing Process Overview  » STEP 4: Reassemble Machine  » 4.1 Subassemblies and Retrofits Installation

Remanufacturing CS-400E Cut & Clinch Machine

CS-400E Machine Remanufacturing Process Overview  | 1. Machine Evaluation | 2. Machine Disassembly | 3. Rebuild Subassemblies | 4. Reassemble Machine | 5. Machine Calibration and Final Test  | 6. Preparation for Shipment | 7. Virtually New Machine at a Lower Cost

STEP 4:  Reassemble Machine

4.1   Subassemblies and Retrofits Installation

In this step the pre-assembled on the bench subassemblies and retrofits are reinstalled into the machine.

You can see in the photos step-by-step installation of remanufactured cut and clinch mechanism, monitor retrofit, pre-assembled work fixture, keyboard/armrest retrofit.

 

 

  Back to STEP 4: Reassemble Machine

  Back to Remanufacturing Process Overview

TopHome »