Remanufacturing Process of CS-400E Cut & Clinch Insertion Machine
Process of Remanufacturing Overview
STEP 1: Machine Evaluation Before Remanufacturing |
STEP 2: Machine Disassembly |
STEP 3: Rebuild Subassemblies |
3.1 Cut and Clinch Mechanism |
3.2 Projector and Microscope Subassemblies |
3.3 Work Fixture |
Step 4: Reassemble Machine |
4.1 Subassemblies and Retrofits Installation
|
Retrofits
|
Computer Retrofit RF-249 |
Monitor Retrofit RF-156-1 |
Armrest / Keyboard Retrofit RF-245-1 |
Driver Retrofits |
4.2 Cosmetic Care |
4.3 Electrical Check List and Upgrades |
STEP 5: Machine Calibration and Final Test |
STEP 6: Prep for Shipment |
STEP 7: Virtually New Machine at a Lower Cost |