Versatec
Home » CS-400E Remanufacturing Process Overview  »  STEP 1: Machine Evaluation

Remanufacturing CS-400E Cut & Clinch Machine

CS-400E Machine Remanufacturing Process Overview  | 1. Machine Evaluation | 2. Machine Disassembly | 3. Rebuild Subassemblies | 4. Reassemble Machine | 5. Machine Calibration and Final Test  | 6. Preparation for Shipment | 7. Virtually New Machine at a Lower Cost

STEP 1: Evaluation of CS-400E Machine before Remanufacturing

This is a machine that recently went through our remanufacturing process. This machine was in service just prior to being sent to us for remanufacturing. It is obvious this machine is in need of some TLC.

Monitor discolored. The new monitor retrofit will be installed.

Armrests severely worn, keys missing from the keyboard. Keyboard retrofit and new padded arm rests will be installed.

Although the computer was still functional, it was determined it was too old to leave in service. Computer retrofit to be installed.

Overall machine is very dirty and dusty inside and out.

Cut and clinch mechanism to be totally rebuilt.

Electrical assemblies

TopHome »